Measuring and Ordering
With a measuring tape, measure the area of your planned lawn. Include these
measurements on a sketch of the lawn area, with the length, width, and any unusual
features. We will be happy to assist you in determining the amount of turfgrass sod
you will need from your sketch.
Schedule your order for delivery of turf after preparatory work is completed and
you are ready to install. Prompt installation on the day of delivery is crucial to a
strong beginning for your lawn.
Yard Preparation
For best result, rototill or spade the area to a depth of 10 to 15 cm. (4 to 6 in.).
Eliminate drainage problems by having soil slope away from foundations. Soil test
your lawn area with the assistance of qualified service in your area. Then rake in
fertilizer, lime, peat, compost, etc. as need to a depth of 7 to 10 cm. (3 to 4 in.). Rake
and smooth the soil removing rocks, roots, and large clods. Roll the area lightly with
a lawn roller 1/3 full of water. This will firm the soil surface and reveal low areas that
need more soil. Keep the grade 2 to 3 cm. (1 in.) below sidewalks or driveway.
Water the prepared area to settle soil and provide a moist base for turf. Moistening
to a depth of 15 cm. (6 in.) is recommended for most soils. However, consult with
K&M representatives regarding your specific soil needs and your local water
conservation measures.
Turf Installation
Install your lawn immediately upon delivery. Begin watering lawn within 30 minutes
of installation. Turf is a living plant that requires ground contact and moisture to
survive!
Begin installing turf along the longest straight line, such as a driveway or sidewalk.
Butt and push edges and ends against each other tightly, without stretching. Avoid
gaps or overlaps. Stagger the joints in each row in a brick-like fashion, using a large
sharp knife to trim corners, etc. Avoid leaving small strips at outer edges as they will
not retain moisture. On slopes, place the turf pieces across the slope.
To avoid causing indentations or air pockets avoid repeated walking or kneeling on
the turf while it is being installed or just after watering. After installing the turf, roll
the entire area to improve turf/soil contact and remove air pockets.
Watering
Give your new lawn at least 2 to 3 cm. (1 in.) of water within 1/2 hour of installation.
Water daily, or more often, keeping turf moist until it is firmly rooted (about 2
weeks). Then less frequent and deeper watering should begin.
After the turf is well established, begin watering using your local evapotranspiration
rate.




Call or e-mail Us:
Phone: 307-631-4459
E-mail: maryawright@yahoo.com